Gravity Media

Client: Dubai Sports City

June 30, 2011optixsolutionsCase StudiesComments Off

Project: HD Broadcast Cable and Control Room Installation

For client Dubai Sports City, Gearhouse Broadcast delivered an integrated broadcast system for a state of the art 30,000 seat cricket stadium. The stadium is described by Dubai Sports City as one of the most advanced of its kind in the world and the International Cricket Council (ICC), the world-governing body of cricket, has been involved at all stages of the design process to ensure that the stadium meets the relevant specifications for hosting international cricket fixtures. The ICC new headquarters will now be based out of Dubai and not Lords in the UK. Continue reading →

Client: Qatar National Olympic Committee

June 30, 2011optixsolutionsCase StudiesComments Off

Project: HD Broadcast Cable Installation

Gearhouse Broadcast and associate company AV Tech were awarded the contract to upgrade the technical infrastructure at four football stadia in Doha, Qatar – Al Gharaffa, Al Rayyan, Al Sadd Sports Club and the Qatar Sports Club. Continue reading →

Client: Al Jazeera

June 30, 2011optixsolutionsCase StudiesComments Off

Project: Design, Supply and Installation of Studio Upgrade

Al Jazeera required an equipment upgrade to one of their control rooms as the existing equipment had become obsolete. They also took the opportunity to upgrade various other systems within the control rooms. Continue reading →

Client: Astro

June 30, 2011optixsolutionsCase StudiesComments Off

Project: Design, Supply and Installation of HD Studio Upgrade

After competing in a fully competitive tendering process, Gearhouse Broadcast’s Systems Integration division was awarded the contract to upgrade Astro’s studio facilities in Kuala Lumpur to accommodate HD productions. The studios are used by both Astro and Arena to produce a wide range of shows including singing and dancing competitions, live music performances, game shows, talk shows and sport highlights. The state-of the-art HD digital broadcast facilities will be the first of their type in Malaysia for market leader Astro. Continue reading →

Client: Qatar State

June 30, 2011optixsolutionsCase StudiesComments Off

Project: Installation of Production Gallery, Studio and Lighting

Gearhouse Broadcast delivered a complete, high specification; turnkey broadcast installation at the State Mosque of Qatar. The new state mosque at Al-Khuwair in Doha is a prestigious new building which can accommodate more than 10,000 worshippers and is believed to be the biggest mosque in the Middle East. Continue reading →

Client: M-Net South Africa

June 30, 2011optixsolutionsCase StudiesComments Off

Project: Build of a High Definition Outside Broadcast Unit

M-NET approached Gearhouse Broadcast when they were looking to purchase a high specification, high definition outside broadcast trailer for an outside broadcast facility. Gearhouse Broadcast was able to offer the systems integration of a custom built, multi-format trailer. Continue reading →

Client: Doordarshan

June 30, 2011optixsolutionsCase StudiesComments Off

Project: Build of a High Definition Outside Broadcast Van

As part of a major investment programme in HD technology Indian state broadcaster Doordarshan commissioned Gearhouse Broadcast to design a custom build high definition outside broadcast van. Built by Gearhouse Broadcast, the project was carried out in conjunction with leading Indian broadcast re-seller AGIV (India) Pvt Ltd. Continue reading →

Client: ATP Media

June 30, 2011optixsolutionsCase StudiesComments Off

Project: ATP Masters 1000 Series 2000 – 2011

A demanding schedule of 10 events taking place across the world covering Cincinnati, Shanghai, Indian Wells, Madrid, Miami, Monte-Carlo, Montreal, Paris and Rome, concluding with the World Tour Finals which since 2009 has been staged in our home town, at the O2 Arena in London. Over 50 broadcasters across the globe take coverage of the series include ABC, CCTV, ESPN, Fox Sports, Sky Sports, CBS, TVE and Eurosport. Continue reading →

Client: Channel 7

Project: Australian Open Tennis 2005 to 2011

Working to Channel 7’s brief Gearhouse Broadcast’s Project Solutions division provided a high definition facility for the Open’s main courts of Rod Laver and Hisense for the first time in the history of the event. Standard definition facilities were integrated for the remaining courts. This year the tournament was bigger than ever before with seven courts used for the event instead of the usual six. A high definition/standard definition production was more challenging to integrate than previous standard definition broadcasts of the tournament. This was due to cross conversion of signals from HD to SD and SD to HD. Continue reading →

Client: FISU

Project: 25th Winter Universiade 2011

Gearhouse Broadcast was awarded the contract to provide the technical production facilities and broadcast transmission for the 2011 25th Winter Universiade. The games took place in Turkey between 27 January and 6 February 2011 and involved nearly 3,000 sportsmen from all around the world. The Organising Committee approached Gearhouse when they were looking for a broadcast solutions specialist to cover the Games opening and closing ceremonies, along with all the outdoor snow events. Continue reading →